capability · T1 · long_context
Needle: numeric fact failed
cap_long_002
Score
0%
Turns
1
1 useful · 0 useless
Interventions
0
harness hints (HHI)
Tool calls
0/0
matched expected trajectory
Errors
0/0
recovered / total
Latency
5.20s
Tokens
1,755
266 reasoning
Cost
$0.00848
context_loss — Lost needed info in long context · expected to contain one of ["3.7"]
Trajectory timeline
Turn-by-turn replay · useless turns annotated with the classifier reason
- #0modelusefulresponse
Prompt / output inspector
instruction
Read the document below. What click-through rate did the phishing simulation report? Reply with the number and a percent sign.
context (5711 chars)
Quarterly operations review: the logistics team consolidated three regional warehouses and reduced average dispatch latency by eleven percent. Engineering notes: the ingestion pipeline was migrated to a streaming architecture; backfills now complete overnight rather than over a weekend. People update: two senior analysts joined the forecasting group, and the mentorship programme was extended to all new graduates. Facilities: the east wing HVAC retrofit is scheduled for the second week of the month, with temporary desk reassignments announced by email. Finance: travel reimbursements now require itemised receipts above the standard per-diem threshold; the policy document was updated accordingly. Security: the annual phishing simulation showed a click-through rate under four percent, the lowest recorded since the programme began. Quarterly operations review: the logistics team consolidated three regional warehouses and reduced average dispatch latency by eleven percent. Engineering notes: the ingestion pipeline was migrated to a streaming architecture; backfills now complete overnight rather than over a weekend. People update: two senior analysts joined the forecasting group, and the mentorship programme was extended to all new graduates. Facilities: the east wing HVAC retrofit is scheduled for the second week of the month, with temporary desk reassignments announced by email. Finance: travel reimbursements now require itemised receipts above the standard per-diem threshold; the policy document was updated accordingly. Security: the annual phishing simulation showed a click-through rate under four percent, the lowest recorded since the programme began. Quarterly operations review: the logistics team consolidated three regional warehouses and reduced average dispatch latency by eleven percent. Engineering notes: the ingestion pipeline was migrated to a streaming architecture; backfills now complete overnight rather than over a weekend. People update: two senior analysts joined the forecasting group, and the mentorship programme was extended to all new graduates. Facilities: the east wing HVAC retrofit is scheduled for the second week of the month, with temporary desk reassignments announced by email. Finance: travel reimbursements now require itemised receipts above the standard per-diem threshold; the policy document was updated accordingly. Security: the annual phishing simulation showed a click-through rate under four percent, the lowest recorded since the programme began. Quarterly operations review: the logistics team consolidated three regional warehouses and reduced average dispatch latency by eleven percent. Engineering notes: the ingestion pipeline was migrated to a streaming architecture; backfills now complete overnight rather than over a weekend. People update: two senior analysts joined the forecasting group, and the mentorship programme was extended to all new graduates. Facilities: the east wing HVAC retrofit is scheduled for the second week of the month, with temporary desk reassignments announced by email. Finance: travel reimbursements now require itemised receipts above the standard per-diem threshold; the policy document was updated accordingly. Security: the annual phishing simulation showed a click-through rate under four percent, the lowest recorded since the programme began. Quarterly operations review: the logistics team consolidated three regional warehouses and reduced average dispatch latency by eleven percent. Engineering notes: the ingestion pipeline was migrated to a streaming architecture; backfills now complete overnight rather than over a weekend. People update: two senior analysts joined the forecasting group, and the mentorship programme was extended to all new graduates. Correction: the phishing simulation click-through rate was actually 3.7%, not 'under four percent' as stated elsewhere. Facilities: the east wing HVAC retrofit is scheduled for the second week of the month, with temporary desk reassignments announced by email. Finance: travel reimbursements now require itemised receipts above the standard per-diem threshold; the policy document was updated accordingly. Security: the annual phishing simulation showed a click-through rate under four percent, the lowest recorded since the programme began. Quarterly operations review: the logistics team consolidated three regional warehouses and reduced average dispatch latency by eleven percent. Engineering notes: the ingestion pipeline was migrated to a streaming architecture; backfills now complete overnight rather than over a weekend. People update: two senior analysts joined the forecasting group, and the mentorship programme was extended to all new graduates. Facilities: the east wing HVAC retrofit is scheduled for the second week of the month, with temporary desk reassignments announced by email. Finance: travel reimbursements now require itemised receipts above the standard per-diem threshold; the policy document was updated accordingly. Security: the annual phishing simulation showed a click-through rate under four percent, the lowest recorded since the programme began. Quarterly operations review: the logistics team consolidated three regional warehouses and reduced average dispatch latency by eleven percent. Engineering notes: the ingestion pipeline was migrated to a streaming architecture; backfills now complete overnight rather than over a weekend. People update: two senior analysts joined the forecasting group, and the mentorship programme was extended to all new graduates. Facilities: the east wing HVAC retrofit is scheduled for the second week of the month, with temporary desk reassignments announced by email.
final output
Under 4%
expected
3.7%
Spans
1 recorded · tokens & cost per span
- generate5.20s1487 in · 0 cached · 2 out · 266 reasoning · $0.00848 · ttft 719ms
Events
- task_started{"trial":0,"taskId":"cap_long_002","scaffold":null}
- task_finished{"score":0,"passed":false,"taskId":"cap_long_002","failureLabel":"context_loss"}
Scorer metadata
{
"toolLog": [],
"scaffold": null
}Capabilitycontainsdifficulty 4/5